CODES

Superior Walls products are manufactured and/or installed according to national standards and recognized codes by Advanced Concrete Systems, which operates as a licensee of Superior Walls of America, Ltd., New Holland, PA.

NGBS Green Certified Product
Superior Walls is a manufacturer of NGBS Green Certified products. 
For more information about this program, click the button below.

Model Building Codes
International Residential Building Code 2015, 2012, 2009, 2006
Model Building Codes
SUPERIOR WALLS IS A MEMBER OF
NAHB, PennBoc, and ICC
SUPERIOR WALLS IS A MEMBER OF
WARRANTY INSTITUTIONS
Residential Warranty Corporation (RWC) Home Buyers Warranty™ (2-10)
WARRANTY INSTITUTIONS

Code Evaluation Reports & Checklist

MANUFACTURING PROCESS

Superior Walls are custom designed and built in a factory-controlled environment to demanding specifications. Take an interactive tour through our manufacturing plant to see the process of design, setup, pouring and finishing of the walls and loading walls for delivery to your job site

Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls
Advanced Concrete Superior WallsAdvanced Concrete Superior Walls

SITE PREPARATION

Watch this short 5 minute video for important site preparation details including critical winter time preparation instructions.

GRAVEL FOOTING SYSTEM

The gravel footing system, promoted by architect Frank Lloyd Wright, allows water to drain away from the wall and will not have water penetrating into the foundation

Gravel Footing System

Inside or out, this 4″ perforated drain pipe assures you of a drier foundation by collecting and channeling excess water away. Drain should be located 12″ away from just below the base of the Superior Wall system.

The Superior Walls system offers the quickest and most efficient installation process of any product or system on the market. Our experienced crews can install an average foundation in about five hours, regardless of most weather conditions.

To avoid delays and ensure fast and proper delivery and installation of Superior Walls, follow these basic site preparation guidelines:

  • A 40′ x 40′ level area, clear of overhead obstructions, must be provided for the crane.
  • The basement must have an overdig of 24″ at the bottom of the excavation.
  • The drainage system must be in place and functional.
  • Corner pins of the foundation must be set with pieces of rebar.
  • Crushed stone must cover the entire floor area, and be level to within 1″.
  • The builder is to provide bracing materials for the wall system. Various lengths of 2×4 are preferred.
  • The builder must be sure that the site is accessible for delivery truck and crane. Check for mud, sharp turns and hills, bumps, trenches, trees and overhead wires. (You may be required to provide a tracked vehicle on-site the day your foundation is set).